Please use this identifier to cite or link to this item: http://dspace.mediu.edu.my:8181/xmlui/handle/1721.1/1335
Full metadata record
DC FieldValueLanguage
dc.contributorMassachusetts Institute of Technology. Laboratory for Information and Decision Systems.-
dc.contributorGershwin, S. B.-
dc.date2002-06-21T03:40:26Z-
dc.date2002-06-21T03:40:26Z-
dc.date1984-
dc.date.accessioned2013-05-31T16:51:43Z-
dc.date.available2013-05-31T16:51:43Z-
dc.date.issued2013-06-01-
dc.identifierhttp://hdl.handle.net/1721.1/1335-
dc.identifier.urihttp://koha.mediu.edu.my:8181/jspui/handle/1721-
dc.descriptionby Stanley B. Gershwin.-
dc.descriptionBibliography: leaf 12.-
dc.description"September, 1984."-
dc.descriptionU.S. Army Human Engineering Laboratory Contract no. DAAK-11-82-K-0018-
dc.format12 leaves-
dc.formatapplication/pdf-
dc.languageeng-
dc.publisherMassachusetts Institute of Technology, Laboratory for Information and Decision Systems-
dc.relationLIDS-R ; 1395-
dc.subjectTK7855.M41 E386 no.1395-
dc.subjectFlexible manufacturing systems Production control-
dc.subjectProduction scheduling-
dc.titleA hierarchical scheduling policy applied to printed circuit board assembly-
Appears in Collections:MIT Items

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.